Looking at waste from an IT point of view

Looking at waste from an IT point of view

Rodrigo Aquino
May 14, 2014
Control text size:
A+
A-

COLUMN - For those working in the I.T. world, identifying waste can be tricky. However, starting by tackling over-production will help you to eliminate every other form of waste.


Words: Rodrigo Aquino, Lean Institute Brasil


In 1937, while working at Toyoda Automatic Loom Works, Taiichi Ohno heard a man say that the productivity of an American worker was nine times higher than a Japanese worker’s.

When, in 1945, Kiichiro Toyoda said the organization would catch up with the United States in three years (the car industry in Japan would not have survived otherwise, he claimed), Ohno found himself thinking about that gap in productivity. It was clear to him that the Japanese were doing something wrong and there was too much waste in Toyota’s processes.

If that waste could be eliminated, production would increase at once. This was Ohno’s assumption, which represented the moment the Toyota Production System was conceived.

As we know, Ohno saw seven types of waste: over-production, waiting, transportation, over-processing, inventory, motion, and defective products. He was certain that the complete elimination of these wastes would increase the efficiency of operations. To start, Toyota started to produce only what was necessary – that is, it tackled over-production before anything else.

There are certain environments, however, where the seven wastes are hard to detect. Unfortunately, IT is one of them. So what to do?

In his book Lean IT, Steve Bell adapted the seven wastes to information technology, also comparing them to manufacturing and office environments, as shown in Figure 1 (at the end of the book, you can find more specific examples that can help to clarify these concepts).

{popup}

Comparing waste in manufacturing, office and IT. Source: Bell, C. S. and Orzen, A. M. (2011), Lean IT - Enabling and Sustaining Your Lean Transformation (p. 57). New York: CRC Press

Steve also describes lean IT as based on two dimensions: one is outward-facing, to improve management and business processes, while the other is inward-facing, using principles and tools to improve operations, services and software development.

It is important to clarify this separation in order to understand in which area of IT the wastes are occurring. In the box below I present some examples of waste, categorized as inward or outward.

The worst waste in IT, manufacturing or office is indeed over-production, because with it come all the others.

Over-production is the first step towards creating awareness in people and towards facilitating the evolution of an organization. It’s what Toyota did when TPS was first introduced: starting with over-production, it tackled each one of the wastes.

To help a business improve, there is no need for supposedly revolutionary pieces of software or elaborate management systems. An unwavering resolve to tackle waste in its every form first will bring in the results.

As an example, imagine a factory that produces 200,000 pieces per month and manages to save two seconds per piece produced. The saving would be a staggering 111.11 hours: that would translate in less manpower deployed, less energy expenditure, and so on. After decreasing waste, cost reductions tend to follow naturally.

The same principle can be applied to an IT company if we take into consideration the amount of time wasted each day with unproductive meetings, phone calls, emails, etc. Calculate how much time this would be times the number of employees, consider a month's work, and you’ll see how big a number we are talking about.

No matter what type of organization you work for, understanding and eliminating waste is the core activity of any transformation.


THE AUTHOR

Rodrigo Aquino has worked in I.T. for 16 years. He holds an MBA in Software Engineering at University of São Paulo and is a graduate in Computer Science at the Pontifícia Universidade Católica de São Paulo. He's held the role of Coordinator of Information Technology at Lean Institute Brasil for over three years. He has worked with organizations including ICEC, Totvs, Wunderman, and Petrobras.


Read more

Avoiding the most common mistakes with VSM
May 30, 2019
Avoiding the most common mistakes with VSM

THE NAKED GEMBA – Value stream mapping is a fundamental tool in any lean transformation. The author takes us the most common mistakes companies make using it, so that you can avoid the pitfalls.

Continue reading
Changing our minds to change our business
July 30, 2020
Changing our minds to change our business

NOTES FROM THE GEMBA – It can take time to challenge our misconceptions and set off on a lean journey. Once we get it, however, it’s hard to stop the improvements, as this French company found out.

Continue reading
What is the role of a sensei in a lean organization?
May 27, 2014
What is the role of a sensei in a lean organization?

RESEARCH - For most CEOs, working with a sensei is common practice. Yet, many questions remain on this role. This paper aims to bring clarity to the "sensei mystery".

Continue reading
Making hoshin work for our lean hotel
October 25, 2018
Making hoshin work for our lean hotel

VIDEO - The director of a hotel in the Canary Islands explains the hoshin efforts taking place in the organization and takes us through the lean strategy deployment boards she uses to track progress and highlight problems.

Continue reading

Read more

No items found.